Planner
On this page
A plan tracks the work of a project, a milestone or a feature: tasks with statuses, priorities, people and dates. Show it as a kanban, a table or a calendar, drag tasks onto boards and pages, link tasks to assets and to board items, and let MOSAIC remind you of what is overdue.
Plans
Create a plan with the arrow next to + New page at the bottom of the sidebar > New Plan, New plan in the command palette (Ctrl+K), or Ctrl+Shift+P. A new plan has four statuses: To Do, In Progress, Review and Done (Done counts as finished). Change them any time (see Statuses).
Every plan is one file (plans/<id>.plan.json) in the workspace; tags and team members are shared by every plan of the workspace. All edits are undo steps (Ctrl+Z / Ctrl+Y).
The planner header
From left to right:
| Control | What it does |
|---|---|
| Plan name | Double-click to rename the plan |
| Kanban / Table / Calendar | Switches the view. Each plan remembers its last view |
| Progress | "done / total done" with a bar, counting every task of the plan |
| N overdue | Shown when tasks are overdue. Click it to show only the overdue tasks (click again to show all) |
| Search box | Filters tasks by text in the title, description, tags, assignee or checklist (Ctrl+F) |
| Filter | Filters by status, priority, assignee, tag or due date. Shows Filter (N) while filters are active |
| Cards | (Kanban only) card size, the fields shown, empty fields, covers and list width (see Kanban cards) |
| New task | Adds a task to the first status that is not done and opens its details |
| Plan menu | Export CSV..., Show overdue reminder, Details panel (show or hide the task details), Tags and People (see Tags and people) |
The header never overflows: in a narrow planner (a plan embedded in a page, or a small tab) the view switch and the Filter and Cards buttons keep only their icons (their tooltips still name them); narrower still, the progress hides and New task becomes a + button.
Filters
The Filter menu has:
- Status: the statuses to show, and Hide done tasks (hides tasks in statuses marked as done).
- Priority: Urgent, High, Medium, Low, None.
- Assignee: the team members, and Unassigned.
- Tags (any): a task passes when it has any of the checked tags.
- Due date: Any, Overdue, Due today, Due this week (the week starts on the First Day of Week of the settings), No due date.
- Reset filters: shows every task again and clears the search.
Filters and the search apply to every view and to the CSV export. They are not saved in the plan: each time you open a plan you see all its tasks.
Tasks
A task has:
| Field | Notes |
|---|---|
| Title | Shown on cards, rows and chips |
| Status | The kanban column. Moving a task into a done status records its completion date; moving it out clears it |
| Priority | None, Low, Medium, High, Urgent (an icon on cards) |
| Assignee | One person from the workspace's members |
| Start, Due | Optional dates, each with an optional time of day ("20 Nov 14:30"). The due date drives the due chip colour and the overdue reminders |
| Remaining | Shown (read only): the time left until the due date, from the start date when there is one ("Starts in 2d", "3d 4h left", "Due today", "Overdue 1d", "Done") |
| Estimate | Hours of work (0 = none) |
| Tags | Workspace tags, each with a colour |
| Checklist | Entries you tick; cards show the progress |
| Progress | 0 to 100 %: automatic (from the checklist, 100 % when done) or set by hand (see Progress) |
| Description | Markdown (see Boards for the syntax) |
| Related assets | Project assets (click to show in the Content Browser, double-click to open) |
| Board items | Items of boards (click to open the board and select the item) |
| Colour | A stripe on the kanban card |
| Cover | An image or a colour band on top of the kanban card (right-click > Cover) |
| Created, Updated, Completed | Recorded automatically |
Due dates and colours
Due chips, table cells and calendar chips use the same colours:
| State | Colour | Meaning |
|---|---|---|
| Overdue | Red | The due date is before today (or, for a due date with a time, that time has passed) and the task is not done |
| Due soon | Amber | Due today or in the next days: fewer days away than Due Soon (Days) (2 by default: today and tomorrow) |
| Done | Green | The task is in a done status |
| Later | Neutral | Due later |
Chips use short texts such as "Today", "Tomorrow", "Yesterday" or "3 d late"; tooltips give the full date in your Date Format.
Progress
Every task has a progress from 0 to 100 %. It is automatic until you set it:
- Automatic: 100 % when the task is in a done status, otherwise the share of its checklist that is ticked (0 % without a checklist). New tasks are automatic.
- By hand: any value you set (dragging, clicking, typing or a preset) is kept as it is, whatever the checklist says, until you choose Automatic again.
Set it where you see it:
- Plan table, Progress column: drag the bar (the value follows live, Shift steps by 10, the whole drag is one undo step), click a position on the bar for that value, double-click the cell or press Enter to type a percent (a trailing
%is fine), or right-click it for 0 %, 25 %, 50 %, 75 %, 100 %, Type a value..., Automatic (from checklist) and Row actions.... A handle shows on the bar on hover; the percent is dimmer while the value is automatic; the tooltip says how it works. - Task details: the Progress row under Remaining (see Task details).
- Any task (card, row or calendar chip): right-click > Progress > Automatic (checklist) or 0 % to 100 %, for every selected task.
Kanban cards show the progress as a bar, sorting by Progress uses the real value, and formula columns read it with prop("Progress").
Selecting and keys
Click a task to select it; Ctrl+click adds or removes tasks; Ctrl+A selects every visible task. While the planner has the focus:
| Key | Action |
|---|---|
| Enter | Open the details of the selected task |
| Delete / Backspace | Delete the selected tasks (undo with Ctrl+Z) |
| Ctrl+D | Duplicate the selected tasks |
| Ctrl+F | Search |
| Esc | Close the details panel, or clear the selection |
| Arrow keys | (Kanban) move the selection between cards and columns |
| F2 | (Table) rename the selected task |
Plans also show their progress on project Home pages and in the Plan Progress and Calendar widgets of any page (see Projects).
Right-click a task (card, row or calendar chip) for Open details (Open in plan in an embedded plan), Status, Priority, Assignee, Start date, Due date, Tags, Progress, Cover, Add to board, Duplicate and Delete. With several tasks selected, the menu changes all of them.
Kanban

The kanban is a card board: one list per status, in order, side by side on a darker board. Scroll the lists sideways with Shift + mouse wheel anywhere on the board, or with the plain wheel over its empty part; the wheel over a list scrolls its cards.
Lists
Each list has a header with a colour dot, the status name, the number of cards and, on hover, a + (add a card) and the list menu button (it stays while its menu is open):
- Rename: double-click the name, type and press Enter (Esc cancels).
- WIP badge: with a WIP limit, the count reads "cards / limit" ("4 / 5") and turns red when the list holds more cards than its limit; its tooltip says so.
- Width: drag a list's right edge to change the width of every list, live (200 to 600 pixels; one undo step per drag). Double-click the edge for the default width. The width is also in Cards (below).
- Collapse: Collapse list in the list menu folds it into a thin vertical strip with its card count; click the strip to open it again.
- Reorder: drag a list by its header: it lifts, and a gap opens where it will land while the other lists slide. Drop it to change the order of the statuses (also Move left / Move right in the list menu).
- + Add another list after the last list: type the name (Enter list name...) and press Enter or Add list to add a status at the end; Esc closes the field.
Cards
- Cards show the title and, by default, the tag pills, priority icon, due chip, remaining time, checklist progress and the assignee's initials, plus the number of related assets and board items and a mark when the task has a description. A progress bar shows when the task has progress (set by hand, or a checklist with ticked items; see Progress). Done tasks are drawn struck through. Choose what the cards show, and their size, with Cards (below).
- Covers: right-click a card > Cover puts a colour band (a swatch) or an image (Choose image...: PNG, JPEG, GIF..., copied into the workspace media folder) on top of the card; Remove cover takes it off. Show covers in Cards shows or hides every cover.
- Add a card: + Add a card at the bottom of a list (or the + of its header, or Add a card in the list menu) opens an inline composer: type a title (Shift+Enter for a new line) and press Enter or Add card. The composer stays open for the next card; Esc or its x closes it. In a plan embedded in a page, New opens the composer (in the Kanban view).
- Edit the title in place: hover a card and click its pencil; Enter saves, Esc cancels.
- Drag cards to another list to change their status, or within a list to reorder them. The card lifts and tilts under the pointer, a gap of its height opens where it will land and the other cards slide out of the way; near the edges of the board or of a list, it scrolls by itself. Selected cards move together. A list accepts drops anywhere, also when it is empty. Drag cards out of the plan onto an open board or page to add them there (see Tasks on boards and pages).
- Double-click a card (or select it and press Enter) to open its details.
Lists and cards are kept between refreshes and the cards are built as they scroll into view, so boards with hundreds of cards stay smooth.
Statuses and WIP limits
The list menu (the button of a list header, or right-click the list) has:
- Add a card, Rename (or double-click the name), Collapse list / Expand list, Colour.
- WIP limit: No limit, or 1 to 20 cards. Over the limit, the count turns red ("Over the WIP limit: finish work before starting more").
- Cards here are done: cards in this list count as finished (progress, no overdue warnings, completion date). A check mark in the header shows done lists. A plan can have several done statuses.
- Lists: Move left / Move right (or drag the header), Add list after.
- Sort by due date (no date last) and Sort by priority (urgent first): reorder the cards of the list once.
- Delete list: its cards move to the neighbouring list. A plan always keeps at least one status.
Kanban cards
Cards in the planner header (Kanban view) opens a popover; the choices are saved in the plan:
| Option | What it does |
|---|---|
| Card size | A slider for any size from 75 % to 175 %, and three presets: Compact (one title line, 85 %), Default (up to three title lines, 100 %) and Large (the full title, a description preview and labelled fields, 130 %). Ctrl + mouse wheel over the board resizes the cards live (one undo step after a short pause). The cards stay crisp at every size |
| Fields | Automatic (tags, priority, due date, remaining, checklist and assignee), or the fields you tick: Priority, Assignee, Start, Due, Remaining, Estimate, Tags, Checklist, Progress, and the plan's own table columns |
| Show empty fields | Shows the chosen fields even when a task has no value (a faint placeholder), so every card has the same rows |
| Show covers | Shows the covers of the tasks on top of their cards (set with right-click a card > Cover) |
| List width | The width of the lists (200 to 600), with a button for the default width. You can also drag a list's right edge |
Tables in pages and on boards use the same card board in their kanban view (see Tables).
Table

The Table view is the same table as the tables of pages and boards (see Tables in plans), so it has everything they have: horizontal scroll with a sticky first column, resize and auto-fit, drag a header to reorder the columns, hide columns, sort and search, colour rules, footer summaries, formulas and dates with a time.
Every visible task is a row, with the columns Title, Status, Priority, Assignee, Progress (a bar you can drag, see Progress), Start, Due, Remaining, Estimate, Tags and Updated (Start comes before Due). + New task at the end adds a task and lets you type its title.
- Your own columns: + at the end of the header row adds any column, a quick field or a formula field; the values are saved in the plan's tasks. The built-in columns keep their type and cannot be deleted; Remaining and Updated are computed (read only). Progress is editable: a value you set is kept by hand, an empty cell (right-click > Automatic (from checklist)) goes back to automatic.
- Remaining: "Starts in 2d" before the start date, "3d 4h left" with a bar of the elapsed time between Start and Due, "Due today", "Overdue 1d" in red, or "Done" (see Remaining columns).
- Edit inline: click a cell to edit it: the title, status, priority, assignee, tags, the progress, the estimate in hours, and the dates in a date picker that can add a time of day (see Dates and times).
- Sort: Sort in the table toolbar, or the column menu (status sorts in column order).
- Reorder: drag a row by its handle (hover the row) to change the plan's order (the table must be unsorted). The same drag onto an open board adds task cards.
- Open: the open button on a row's title, or a double-click on the title, shows the task details; right-click a row for the task menu.
- Keyboard: the table's cell keys (see Tables), F2 renames the selected task.
The column layout (order, widths, hidden columns, your own columns) and the sort are saved in the plan.
Dates and times
The date pickers of the planner (task details, table cells, the task menus) can give a date a time of day: Add time shows a time row with the hour and minute fields (type, drag or wheel; minutes in 15 minute steps; while you drag a field the task follows live, and the whole drag is one undo step), arrows for 15 minutes earlier or later and quick chips (09:00, 12:00, 15:00, 18:00); Remove time keeps only the day. Dates with a time show it after the date ("20 Nov 14:30"). A due date with a time is overdue as soon as that time has passed; a date without a time lasts the whole day.
CSV export
Plan menu > Export CSV... saves the tasks shown (search and filters apply, in the table's order and sort) as a CSV file that spreadsheet applications open directly (UTF-8). It works from any view. Columns: Title, Status, Priority, Assignee, Start, Due, Estimate (h), Tags, Checklist (done/total), Description (plain text), Created, Completed, Id. Dates are written as YYYY-MM-DD.
Calendar

A month grid with each task on its due date, or a week view. Today is highlighted, and the week starts on the First Day of Week of the settings.
- Month / Week switches the view. Week shows the seven days side by side with every task of each day.
- Previous / Next buttons move by a month (or a week), and Today comes back to the current one.
- Tasks with a due time show it first on their chip ("14:30 Review", red once it has passed) and come first in the day, in time order; the whole-day tasks follow.
- Drag a task to another day to change its due date (its time of day is kept).
- Double-click a day (or right-click it > New Task on This Day) to add a task due that day.
- A day with more tasks than fit shows +N more: click it to list them all.
- No date shows the open tasks without a due date in a side list: drag one onto a day to schedule it, or drop a task on the list to remove its due date.
- Done tasks are drawn struck through. Search and filters apply.
- Calendar chips can be dragged onto boards and pages too.
Task details
Open the details panel with a double-click on a task, Enter, New task or Open details. It shows the selected task and updates as you select others. Close it with its x or Esc.
- Title: type and press Enter.
- Status, Priority, Assignee, Start, Due, Remaining, Estimate (h), Colour.
- Assignee lists the workspace's people. Type a name under Add a person and press Enter to add someone to the workspace and assign the task. Manage people renames or removes people.
- Dates open a compact month picker with Today, Tomorrow, +1 week and Clear, and Add time for a time of day (see Dates and times). The due date also shows a short relative text (for example "Tomorrow" or "3 d late").
- Remaining (read only, live) shows the time left until the due date, from the start date when there is one, with a bar of the elapsed time.
- Progress (under Remaining): a bar you drag (live, one undo step per drag) or click, a percent field to type a value, and an Automatic toggle. Under it, a faint line says where the value comes from: "From the checklist: 2 of 5", "The task is done", "No checklist yet" or, when set by hand, "Set by hand (automatic: 40%)". Setting a value turns Automatic off; tick it to follow the checklist again (see Progress).
- Tags: add or remove workspace tags. Type a name under New tag and press Enter to create a tag (it gets a colour) and add it. Click a tag chip to rename, recolour or delete the tag (whole workspace); Manage tags at the bottom of the tag menu does the same for every tag.
- Checklist: type in Add an item and press Enter; tick entries; double-click an entry to edit it; move entries up; remove them.
- Description: double-click to write markdown; it is applied when you click outside or press Ctrl+Enter. Switch between Edit and Preview with the button in the section header.
- Related assets: drop assets from the Content Browser, or press + Selected to add the assets selected in the Content Browser. Click one to show it in the Content Browser, double-click to open it. A moved or deleted asset is marked. Removing a reference never touches the asset.
- Board items: link an item of a board (pick the board, then the item). Click a linked item to open its board with the item selected. Removing a link never touches the item.
- Duplicate (Ctrl+D) and Delete buttons at the top. Created, updated and completed dates at the bottom.
Tasks on boards and pages
- Drag tasks (kanban cards, table rows, calendar chips; selected tasks go together) onto an open board: one task card per task where you drop them, showing the task's live status, due date and assignee; double-click a card to open the task (see Boards).
- Add to board in a task's right-click menu lists your documents: it adds the task cards to that document's canvas, at its last view (they show in References mode).
- Drop tasks onto a page: each becomes a to-do block with the task's title and a link to its plan, ticked when the task is done (see Pages).
- Embed a plan in a page with the slash menu (Plan): a compact, live planner with the Kanban, Table and Calendar views, quick add and the task menus; the plan's name opens the full plan in its own tab (see Pages).
- On a board, More > Task Card picks a task from a menu.
- From a task, Board items links any board item; click it to jump there.
- The command palette (Ctrl+K) finds tasks by their text and opens them with the task selected.
Overdue reminders
- The sidebar shows a red badge on plans with overdue tasks, and the planner header shows N overdue.
- Once a day, shortly after the editor starts, MOSAIC shows a notification for the plans with overdue tasks (up to three plans, the ones with the most overdue tasks first), with the first task titles and an Open button. If the editor stays open past midnight, the next day's reminder comes then.
- Tick Don't show overdue reminders in the notification, or turn off Notify Overdue Tasks in the settings, to stop them. Plan menu > Show overdue reminder shows them now, whatever that setting says.
A task is overdue when its due date is before today (for a due date with a time: when that time has passed) and it is not in a done status.
Tags and people
Tags and people (team members) belong to the workspace (workspace.json), so every plan, and every board item's tags, use the same lists.
- Add them from the task details, or from the Assignee and Tags menus of a task (type a name and press Enter).
- Manage them from Plan menu > Tags / People, from Manage tags / Manage people in the task menus, or by clicking a tag chip in the task details:
- Rename a tag: every task and board item that uses it follows. Colour: pick a new colour. Delete tag: removes it from the workspace, every task and every board item.
- Rename a person: every task assigned to them follows. Remove from workspace: removes the person and unassigns their tasks in every plan.
- Every change is one undo step (Ctrl+Z).
- A new workspace has the tags Idea, Bug and Art.
- Names already used as assignees in a plan also appear in its assignee lists.
- The sidebar's Tags section lists the tags; click one to search for it in the command palette.